2017.3.30
Nippon Engineering Consultants was in charge of detailed design for the central span arch of the Kesennuma Oshima Bridge, which was installed on March 29, 2017.
Please see the page linked for more.Kesennuma Oshima Bridge (AKA Tsurukame Bridge)